Equipment & Furniture

Delivery and installation costs

Need furniture for your restaurant? Let’s talk → Send a quick message. You don’t need a budget or a finished furniture list to get started.

Restaurant dining room with new furniture awaiting placement
In this guide

A furniture price can exclude much of the work needed to put the pieces into your dining room. Ask for a delivered-and-installed scope before treating the quote as a project total.

There is no dependable universal freight percentage or assembly allowance for every restaurant. Location, shipment size, access, furniture construction and the agreed service all matter. Use actual quotes for your site.

Follow the furniture from seller to room

Break the journey into separate steps: packing, line-haul freight, arrival, unloading, movement inside, unpacking, assembly, placement and waste removal.

Ask who performs each step and where responsibility changes. A charge described only as “delivery” is not precise enough for planning.

FedEx's freight guidance on unloading highlights the need to identify equipment such as a liftgate in advance. Your supplier must confirm the arrangement for your own shipment.

Send a site description that can be priced

Provide the delivery address and receiving contact, then describe conditions that could affect the work:

  • Whether there is a usable loading dock or unloading equipment.
  • Receiving hours and appointment requirements.
  • Truck access, parking or other site restrictions.
  • Steps, elevators, narrow doors and long internal routes.
  • Available unpacking and temporary storage areas.
  • Whether work must happen outside trading hours.
  • The condition of the room when furniture will arrive.

Ask the carrier or installer what dimensions and site information it needs. Do not assume that an item fitting through the front door means its packaging will fit every turn on the route.

Separate freight from installation

Service Clarify before comparing prices
Unloading Equipment, labor and delivery point
Inside movement Which room, route and access conditions
Unpacking Who opens cartons and preserves labels for checking
Assembly Tops, bases, seats, glides, hardware and instructions
Placement Whether pieces are set to an agreed plan
Fixed installation Measurement, attachments and responsible installer
Packaging removal What is removed, when and by whom
Old furniture removal Quantity, condition and destination arrangements

Fixed booths or attached table bases may need a different trade and review process from freestanding chairs. Have the relevant professionals define that work rather than asking a general delivery crew to improvise.

Price the consequences of a delayed site

Ask what happens if the room is not ready when the shipment is due. Possible issues include holding at origin, storage, rescheduling, additional handling or another delivery attempt.

Request the actual terms and charges that would apply. Do not convert a supplier's silence into a free storage assumption.

If you are renovating an operating restaurant, coordinate removal and replacement. Taking away the old seating before the new items are inspected can leave a gap that the furniture quote never accounted for.

Keep inspection in the scope

Someone must check quantities, components, finish and condition before the items are placed into service. Name that person and allow an appropriate receiving window.

The FedEx claims guidance identifies supporting documentation and retained packaging as part of a damage process. Clarify the actual seller/carrier procedure before arranging immediate carton disposal.

Ask who returns to fit a replacement component or correct an incomplete installation. A replacement part delivered later does not automatically include the labor to install it.

Build a total with visible exclusions

In the budget, use separate lines for furniture, freight, unloading, inside movement, assembly, installation, storage and removal where relevant. Add taxes and other applicable charges based on the actual quote.

For each line, mark quoted, estimated, intentionally excluded or still unknown. Keep the original quote reference and date.

A scope that excludes old-furniture disposal can still be acceptable if you have priced and assigned that work elsewhere. The problem is an invisible omission.

Ask for one revised total

Use the quote-brief step to describe the site and responsibilities. Request an itemized revision covering the agreed work, then use the quote comparison guide to compare complete alternatives. This produces a usable budget without inventing a market price for your project.